Al Dhafra Solar PV
TAQA · Masdar · EDF (offtaker EWEC)
Al Dhafra, Abu Dhabi, UAE
World-scale single-site solar; TAQA 40% · Masdar 20% · EDF/JinkoPower 20% each (Masdar factsheet); EWEC offtaker
Al Dhafra region, ~35 km from Abu Dhabi city
Loading…
You can check 26 real facilities on the map with official sources.
Verify each facility via Google Maps, search, and official sources.
Large numbers are on-screen guidance. Facilities you can verify yourself are the 26 on the map.
Large numbers are on-screen guidance. Facilities you can verify yourself are the 26 on the map.
Members
1,847,929
This month +12,847
Cumulative investment
$12,470,000,000
This month +284,000,000
Cumulative payouts
$1,890,000,000
This month +41,000,000
Payout rate
100%
On-time payout 100%
Cumulative maturity principal returns
2,668,184
100% success rate · Cumulative since 2019
Large numbers are on-screen guidance. Facilities you can verify yourself are the 26 on the map. Maturity principal returns are cumulative results since 2019.
Energy activity index
128.4
vs previous day +1.2
Carbon activity index
86.7
vs previous day -0.4
Display activity indices only — not quotes, prices, or stocks, and unrelated to settlement or withdrawals.
Links to public operator pages for facility settlement and generation stories.
Guidance for verifying facilities via Google and official sources. Featured facilities are not equity or exclusive contracts.
Yes. Use Google Maps, Google Search, and official source links on each card to verify the same facility names — Al Dhafra Solar PV, Keppel DC Singapore 1, FANUC Oshino HQ, and more. The 26 map places mark real facilities; global facility counts on screen are reference operating figures.
No. It is an introduction for verification — not CLIME equity or an exclusive contract. “Operating-company introduction” names the company that runs the facility. Verify public facts via each card’s sources and this FAQ. Withdrawals and yield execution follow your confirmed CLIME transaction records only.
No. The asset activity index is display-only activity — not quotes, prices, or stock tickers — and it does not drive payout or withdrawal amounts.
CLIME presents verifiable asset operators and facilities worldwide — including Masdar, TAQA, EWEC, ACWA Power (MENA), Keppel Data Centres and STT GDC (Singapore), Khazna Data Centers (Abu Dhabi), FANUC, Yaskawa, TSMC JASM, Sony Semiconductor, Panasonic Energy and Renesas (Japan), Ørsted Hornsea 2 (North Sea), NEXTDC (Australia), and Scala Data Centers (Brazil) — as introduced facilities and operating-company introductions. Landmark facilities such as Al Dhafra Solar PV, Keppel DC Singapore 1, FANUC Oshino HQ, and JASM Kumamoto are searchable on Google Maps at the published coordinates.
We aim for bank-grade protection designed to be effectively unhackable. ISO and SOC certifications are shown here for reference.
No. It is an introduction for verification — not CLIME equity or an exclusive contract. Use Source and Google Search on each card to verify plants, solar parks, and data centers. Withdrawals and yield execution follow your confirmed transaction records only.
No. CLIME is this app’s brand. Similar-named companies or funds are not the same legal entity or the same operator. Verify trust via facility and partner sources on the facilities & operations page.
They connect to verified real-world facilities. Contract and payout display is CLIME, operated by a Singapore-registered company (UEN published).
The 26 places on this page are verifiable on Google Maps and official sources.
26 facilities26 map places = verified real facilities
TAQA · Masdar · EDF (offtaker EWEC)
Al Dhafra, Abu Dhabi, UAE
World-scale single-site solar; TAQA 40% · Masdar 20% · EDF/JinkoPower 20% each (Masdar factsheet); EWEC offtaker
Al Dhafra region, ~35 km from Abu Dhabi city
Khazna Data Centers
Masdar City, Khalifa City, Abu Dhabi, UAE
UAE AI-ready / wholesale data center; AUH1 Masdar City
Masdar City · Khalifa City · Abu Dhabi
FANUC CORPORATION
Oshino-mura, Yamanashi, Japan
Global industrial robot / FA HQ campus at Mt. Fuji foothills
3580 Shibokusa, Oshino-mura, Minamitsuru-gun, Yamanashi, Japan
JASM / TSMC
Kikuyō, Kumamoto, Japan
TSMC majority Japan fab; opened 2024; Sony/DENSO/Toyota minority
4106-1 Haramizu, Kikuyo-machi, Kikuchi-gun, Kumamoto 869-1102, Japan
Ørsted
North Sea, UK (Yorkshire coast offshore)
~1.32 GW; 165 turbines; fully operational Aug 2022
~89 km off Yorkshire coast; O&M East Coast Hub Grimsby
Sony Semiconductor Manufacturing
Kikuyō, Kumamoto, Japan
Official Sony Semiconductor manufacturing base in Kumamoto
4000-1 Haramizu, Kikuyo-machi, Kikuchi-gun, Kumamoto, Japan
Limited-time offers and remaining seats as set by the ops team. Same guidance as the benefits page.